2013年6月2日星期日

Some changes on the final drawings





Some other stuff

 
 
 

weely progress: CAD drawings

It is really hard to tell which drawings is done by which week, so i put all of them here. I can see the change of my design and the ideas of my building. Some ideas had been changed, some disappeared.

The 1st design:
The idea of the basement garden is already here. However, the problem of the circulation appears here and is always a problem for me. I solve this problem till week12...
 
 
The 2nd drawings:


This design was trying to solve the circulation problem, but is still not good enough.Another important change here  is i decide to have a big gallary from the basement level to the top level.
 
The 3rd design:


 This one still works on the circulation.And i change the basement apartment to a bit smaller one.


The 4th design:
Actually the 4th design comes out at the same time of that 5th design. the idea of have 2 trees comes out here and the stair finally goes north-south axis....which influence the 1st level apartment a lot and i finally could have 2 samillar apartments.

The 5th design:
This is when the circulation problem finally comes to an end.....
The 6th design:



This is the one i have on week 12.

week11-12progress (Models)

For those weeks i made another draft model, and the final models for week12 asigment.









This is the 4 models i have made for the design.